BMP ID: |
6290 |
Title: |
If used, earthen pits should be lined |
Text: |
"...whenever earthen pits are used to store wastes, they should be lined with multiple layers of synthetic fabric with leak detection devices between the layers. |
Source Publication Name: |
Oil and Gas Accountability Project, Best Practices |
Citation Section: |
Redesigned pits |
Citation Page: |
1 |
Supplemental Documents: |
See the Source Document for links to supplemental information
|
Usage Type: |
Recommended |
Timing: |
• Drilling
|
Oil / Gas Field: |
|
Surface Ownership: |
• Federal
• State
• Private
|
Mineral Ownership: |
• Federal
• State
• Private
|
Primary Contact: |
Earthworks 1612 K. St., NW, Suite 808 Washington, DC 20006 United States |
|
Alternate Contact: |
|
|
Categories: |
Land Surface Disturbance
Water Quality and Pollution
|
Location: |
General / Federal |
Species: |
|
Vegetation Types: |
|
General Comments: |
|
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2009-11-23 13:56 UTC |
Last Updated: |
2009-11-23 13:56 UTC |