BMP ID: |
5765 |
Title: |
Keep pressurized and install a static seal with these following instructions. |
Text: |
Methane Recovery - Option 3: "Keep pressurized and install a static seal
â—† Automatic controller activates rod packing seal on shutdown and removes seal on startup
â—† Closed blowdown valve leaks
â—† Eliminates leaks from off-line compressor seals
â—† Reduces fugitive methane losses by 1.25 Mcf/hr (89%)" |
Source Publication Name: |
Reducing Emissions When Taking Compressors Off-line: Lessons Learned from Natural Gas STAR |
Citation Section: |
Methane Recovery |
Citation Page: |
9 |
Supplemental Documents: |
|
Usage Type: |
Recommended |
Timing: |
• Production / Operation / Maintenance
|
Oil / Gas Field: |
|
Surface Ownership: |
• Federal
• State
• Private
|
Mineral Ownership: |
• Federal
• State
• Private
|
Primary Contact: |
Environmental Protection Agency Ariel Rios Building, 1200 Pennsylvania Avenue, N.W. Washington, DC 20460 United States |
Phone: | (202) 272-0167 |
|
Alt. Phone: | (202) 272-0165 |
Fax: | |
|
E-mail: | |
|
Alternate Contact: |
|
|
Categories: |
Air Quality and Emissions
|
Location: |
General / Federal |
Species: |
|
Vegetation Types: |
|
General Comments: |
|
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2009-06-22 13:34 UTC |
Last Updated: |
2011-01-29 13:44 UTC |