BMP ID: |
5147 |
Title: |
All long-term facilities should be painted the same color. |
Text: |
Partial Conformance: "All long-term facilities in a particular location should be painted the same color. An operator is typically provided 60 to 90 days to paint new equipment or
buildings moved onto the site." |
Source Publication Name: |
Visual Resource Management BMPs |
Citation Section: |
Choice of Color Part 4 |
Citation Page: |
12 |
Supplemental Documents: |
|
Usage Type: |
Recommended |
Timing: |
• Production / Operation / Maintenance
|
Oil / Gas Field: |
|
Surface Ownership: |
• Federal
|
Mineral Ownership: |
• Federal
|
Primary Contact: |
Jim Perry Minerals, Realty, and Resource Protection Directorate,Division of Fluid Minerals 1620 L Street, N.W, Room 501 Washington, DC 20036 United States |
Phone: | (202) 452-5063 |
|
Alt. Phone: | |
Fax: | (202) 452-0386 |
|
E-mail: | |
|
Alternate Contact: |
|
|
Categories: |
Land Surface Disturbance
Visual Aesthetics
|
Location: |
General / Federal |
Species: |
|
Vegetation Types: |
|
General Comments: |
|
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2009-04-28 10:27 UTC |
Last Updated: |
2009-04-28 10:27 UTC |