University of Colorado at Boulder
BMP of Oil and Gas Development

View BMP

BMP ID: 2465
Title: Comprehensive Drilling Plan will include a list of all proposed oil and gas facilities to be installed.
Text: "c. Information requirements.... The following information may be included as part of a Comprehensive Drilling Plan, depending on the circumstances:(4) A list of all proposed oil and gas facilities to be installed within the area covered by the Comprehensive Drilling Plan over the time of the Plan and the anticipated timing of the installation;"
Source Publication Name: Colorado Oil and Gas Conservation Commission, Practice and Procedure, 2 CCR 404-1, Final Draft Rules 11 07 08
Citation Section: 216. COMPREHENSIVE DRILLING PLANS
Citation Page: 216(c)(4)
Supplemental Documents:  
Usage Type: Required
Timing: • Production / Operation / Maintenance
Oil / Gas Field:  
Surface Ownership: • Federal
• State
• Private
Mineral Ownership: • Federal
• State
• Private
Primary Contact: No Contact Listed
Phone:     Alt. Phone:
Fax:     E-mail: 
Alternate Contact:  
 
Categories: Land Surface Disturbance
Location: Colorado
Species:
Vegetation Types:
General Comments:
Cost-Benefit Analysis:
BMP Efficacy:
Date Entered: 2009-02-24 14:42 UTC
Last Updated: 2009-02-24 14:42 UTC