BMP ID: |
2461 |
Title: |
Comprehensive Drilling Plan Responsibilities |
Text: |
"b. Scope. A Comprehensive Drilling Plan shall cover more than one (1) proposed oil and gas location within a geologic basin, but its scope may otherwise be customized by the operator to address specific issues in particular areas. Although operators are encouraged to develop joint Comprehensive Drilling Plans covering the proposed activities of multiple operators where appropriate, Comprehensive Drilling Plans will typically cover the activities of one operator." |
Source Publication Name: |
Colorado Oil and Gas Conservation Commission, Practice and Procedure, 2 CCR 404-1, Final Draft Rules 11 07 08 |
Citation Section: |
216. COMPREHENSIVE DRILLING PLANS |
Citation Page: |
216(b) |
Supplemental Documents: |
|
Usage Type: |
Required |
Timing: |
• Drilling
• Production / Operation / Maintenance
|
Oil / Gas Field: |
|
Surface Ownership: |
• Federal
• State
• Private
|
Mineral Ownership: |
• Federal
• State
• Private
|
Primary Contact: |
No Contact Listed |
Phone: | |
|
Alt. Phone: | |
Fax: | |
|
E-mail: | |
|
Alternate Contact: |
|
|
Categories: |
Land Surface Disturbance
|
Location: |
Colorado |
Species: |
|
Vegetation Types: |
|
General Comments: |
|
Cost-Benefit Analysis: |
|
BMP Efficacy: |
|
Date Entered: |
2009-02-24 14:22 UTC |
Last Updated: |
2009-02-24 14:22 UTC |