Setback requirements in Commission orders must be met prior to producing well.
Text:
"321. DIRECTIONAL DRILLING: If an operator intends to drill a horizontal or deviated wellbore utilizing controlled directional drilling methods, other than whipstocking due to hole conditions, the plans shall accompany an application for Permit-to-Drill, Form 2. In addition to the information required on the plat in Rule 303.c., the plat shall also show the surface and bottom hole location. If the surface location is in a different section than the bottom hole location, a plat depicting each section is required. Additionally, the proposed directional survey including two (2) wellbore deviation plots, one depicting the plan view and one depicting the side view, shall accompany the application. Within thirty (30) days of completion the operator shall submit a Drilling Completion Report, Form 5, according to Rule 308., with a copy of the directional survey coordinate listing and the wellbore deviation plots (plan and side views). The survey data shall be provided in a single analysis report with sufficient detail to determine the location of the wellbore from the base of the surface casing to the kick off point and from that point to total depth. It shall be the operator's responsibility to ensure that the wellbore complies with the setback requirements in Commission orders or rules prior to producing the well."