11596 Action plan if methane concentration increases "5.2 Water Well Monitoring. … If the methane concentration level increases by more than 5 mg/L between sampling periods, or increase to more than ...
11595 Action plan if testing reveals thermogenic or intermediate mix "5.2 Water Well Monitoring. … If the carbon isotope test results in a thermogenic or intermediate mix signature . . .an action plan shall be ...
11601 Additional post completion water tests "5.2 Water Well Monitoring. … Additional 'post completion' test(s) may be required if changes in water quality are identified during follow-up ...
11594 Annual testing if testing reveals thermogenic or intermediate mix "5.2 Water Well Monitoring. . . . If the carbon isotope test results in a thermogenic or intermediate mix signature, annual testing shall be ...
11611 Applicable federal regulations "4. Compliance with all applicable regulations of the BLM, BIA and the Southern Ute Indian Tribe when conducting operations on lands subject such ...
11551 BP waives right to dictate road work "3.1 Road Maintenance and Improvement Fees: . . . BP hereby waives its rights, if any, to insist upon completion of the [road] work or to dictate ...
11545 Calculating degree of noncomformity with setback requirements "2.4 Legal Non-Conforming Uses and Setbacks: … The increase, if any, in degree of nonconformity shall be the net difference between the two . . . ...
11782 Compliance terms "2. Compliance with the terms and provisions of all of the Commission's health, safety, welfare and environmental rules and regulations now or ...
11781 Compliance terms "1. Compliance with all terms, conditions and provisions of prior Commission Orders in Cause No. 112, including without limitation, the specific ...
11571 Comply with weight restrictions "3.7 Produced Water Hauling. . . .In those instances where the utilization of a water hauling truck is required, BP agrees to strictly comply with ...
11592 Compositional analysis and carbon isotopic analyses "5.2 Water Well Monitoring. … If free gas or a methane concentration level greater than 2 mg/L is detected in a water quality testing well, ...
11603 Copies of water test results provided "5.2 Water Well Monitoring. … Within three (3) months of collecting the samples used for the test, copies of all test results described above ...
11549 County exercises good faith in performing road work from impact fees "3.1 Road Maintenance and Improvement Fees. County and BP have determined that specific land use activities by BP within the Infill Application Area ...
11562 County proves notice to BP "3.4 Submission of Information: . . . The first submission of such information, [the forecasted activity], shall occur within thirty (30) days after ...
11563 County proves notice to BP "3.4 Submission of Information: . . . The County agrees to reciprocate and provide notice to BP of its intended projects and its expected schedule ...
11550 County shall control road impact work "3.1 Road Maintenance and Improvement Fees: . . . The County shall control the sequencing and timing of such [road impact] work"
11558 County's reasonable efforts to adopt applicable road impact fee program "3.3 Adoption of Road Impact Fee or Road Maintenance and Improvement Fee Program. . . .To the extent legally permissible, the County shall use ...
11547 Demonstrate reasonableness of Well Pad expansion "2.5 Expansion of Existing Well Pads: … The reasonableness of the expansion [of existing Well ads] under the circumstances shall be demonstrated by ...
11541 Demonstrating requested need for new facilities "2.3 Use of Existing Infrastructure: . . .At the request of the County, BP shall furnish information demonstrating BP's requested need for new ...
11534 Density of well pads "2.1 Density. BP agrees that, except as provided in Article 2.2 herein or as may be otherwise permitted in the COGCC order approving BP's Infill ...