BMP ID |
Short Title |
Text of BMP |
---|
9220 |
Additional Requirements for Multi-Well Pit Construction |
"2. Operator's Pit Practices within the County. ... f. Multi-Well Pits: ... Additional requirements, such as fencing, may be required by the County, ... |
9288 |
Baseline Testing Private Water Wells Near Facility |
"6. Baseline Water Quality Testing. ... c. Private Water Well Owner Request. Operator agrees to conduct a baseline test of any water well requested ... |
11855 |
Baseline Testing Water at Facilities where Rule 609 Does Not Apply |
"4. Baseline Water Quality Testing. ... d. For a location that will include only facilities where Rule 609 does not require Baseline Sampling (flow ... |
9287 |
Baseline Testing Water Sources if No Source is Within 1/2 Mile Radius |
"6. Baseline Water Quality Testing. ... b. No available water sources within one half mile: If there are no available water sources located within a ... |
9286 |
Baseline Testing Water Sources Near Operation |
"6. Baseline Water Quality Testing. ... a. Criteria and Protocol: Using the Commission's criteria and protocol for sample analyses, types, ... |
9230 |
Berm Inspection and Repair |
"3. Berms. Berms shall be inspected by Operator on a weekly basis for evidence of discharge. Berms shall be inspected within 48 hours of a ... |
9297 |
Bond Collateral for Erosion Control and Emergency Response Applications |
"11. Erosion Control. ... A general performance bond in a form and amount acceptable to the County will also be allowed to guarantee performance ... |
9296 |
Collateral for Erosion Control Permit |
"11. Erosion Control. ... the County will also accept a blanket collateral in a form and amount acceptable to the County so that separate collateral ... |
9295 |
Common Erosion Control Permit Application for All Facilities |
"11. Erosion Control. ... The County will permit the Operator to submit a standard GESC plan applicable to all of the Operator's oil and gas ... |
9188 |
Construction and Documentation Requirements for Discouraged Pits |
"2. Operator's Pit Practices within the County. ... c. Additional Pits that Require County Review and Approval: ... Construction of these pits will ... |
9205 |
Contaminant Separation Requirements in Multi-Well Pits |
"2. Operator's Pit Practices within the County. ... f. Multi-Well Pits: ... Fluids stored in multi-well pits will be circulated through a four-phase ... |
9180 |
Contaminants Monitoring in Open Pits |
"2. Operator's Pit Practices within the County. ... b. Water Storage Pits to Contain Fresh Water or Brine Water: ... As long as the pit is open and ... |
9191 |
Contaminants Testing Upon Pit Closure |
"2. Operator's Pit Practices within the County. ... c. Additional Pits that Require County Review and Approval: ... Upon closure of these pits, pH, ... |
9232 |
County and Operator Will Meet to Discuss Operations |
"4. Regular Meetings to Monitor and Discuss MOU Issues. The County and Operator agree to meet quarterly or as necessary, to monitor and discuss any ... |
9315 |
County Inspections of Operation |
"17. County Inspections. Operator agrees to allow County access to all oil and gas facilities for inspection, provided County personnel are equipped ... |
11853 |
County Must Authorize Pits Within 1/4 mile of Occupied Buildings Except in Emergencies |
"1. Operator’s Pit Practices within the County. ... a. ... Use of these [flare, emergency, plugging and work-over] pits except emergency pits, ... |
9183 |
Discouraged Pit Types |
"2. Operator's Pit Practices within the County. ... c. Additional Pits that Require County Review and Approval: Skimming, settling, percolation, ... |
9292 |
Emergency Response Plan |
"10. Emergency Response Plan. Operator will provide the County with an Emergency Response Plan (ERP) to address all potential emergencies that may be ... |
9294 |
Erosion Control Permit |
"11. Erosion Control. When required by the County's Grading and Erosion/ Sedimentation ("GESC") Regulations, the Operator agrees to apply for and ... |
9285 |
Groundwater Baseline Monitoring |
"6. Baseline Water Quality Testing. Operator agrees to comply with the Commission's Statewide Groundwater Baseline Sampling and Monitoring Rule 609, ... |