You are viewing BMP records related to the Recommendations for Development of Oil and Gas Resources within Crucial and Important Wildlife Habitats, 1100 SERIES PIPELINE REGULATIONS publication.

BMP ID Short Title Text of BMP
2349 All operators must be a member of the Utility Notification Center of Colorado. "d. One Call participation. As to any pipelines over which the Commission has jurisdiction, each operator shall become a member of the Utility ...
2346 All pipeline repairs must first meet the installation requirements in this section. "b. Repair. (2) No operator shall use any pipe, valve, or fitting in repairing pipeline facilities unless the components meet the installation ...
2341 Before operating a flowline it must be tested to maximum operating pressure. "e. Pressure testing of flowlines. (1) Before operating a segment of flowline it shall be tested to maximum anticipated operating pressure. In ...
2342 Flowlines operating at less than 15 psig are exempt from pressure testing requirements "e. Pressure testing of flowlines. (2) Flowline segments operating at less than fifteen (15) psig are excepted from pressure testing requirements."
2347 Markers must be installed to designate pipeline locations. "c. Marking. (1) In designated high density areas, and where crossing public rights-of-way or utility easement, a marker shall be installed and ...
2344 Operator must fix pipeline failure in reasonable time or stop work. "a. Maintenance. (2) Whenever an operator discovers any condition that could adversely affect the safe and proper operation of its pipeline, it shall ...
2350 Operator must prepare and submit an emergency response plan to local authorities. "e. Emergency response. As to gathering lines with segments subject to safety regulation by the Office of Pipeline Safety, U.S. Department of ...
2343 Operator must take precautions to prevent pipeline failures "a. Maintenance. (1) Each operator shall take reasonable precautions to prevent failures, leakage and corrosion of pipelines."
2337 Pipeline must be able to prevent failure corrosion and withstand operating pressures while still in service. "b. Design. Each component of a pipeline shall be designed and installed to prevent failure from corrosion and to withstand anticipated operating ...
2334 Pipeline must be compatible with substances to be transported "a. Material. (1) Materials for pipe and other components of pipelines shall be: B. Compatible with the substances to be transported."
2335 Pipeline must be locatable by a tracer line adjacent to buried nonmetallic pipelines "a. Material. (1) Materials for pipe and other components of pipelines shall be: C. Locatable by a tracer line or location device placed adjacent to ...
2338 Pipeline must have cover for protection from damage. Crop land covers must be minimum of 3 feet. "c. Cover. (1) All installed pipelines shall have cover sufficient to protect them from damage. On crop land, all pipelines shall have a minimum ...
2332 Pipeline must maintain structural integrity under temperature, pressure, and other conditions "a. Material. (1) Materials for pipe and other components of pipelines shall be: A. Able to maintain the structural integrity of the pipeline under ...
2340 Pipeline trenches must be maintained in order to correct subsidence and minimize erosion. "d. Excavation, backfill and reclamation. (2) On crop lands and non-crop lands, pipeline trenches shall be maintained in order to correct subsidence ...
2348 Proper labeling of markers with specific details "c. Marking. (2) The following shall be written legibly on a background of sharply contrasting color on each line marker: "Warning", "Caution" or ...
2345 Repairs must be in a safe manner and monitored by an operator. "b. Repair. (1) Each operator shall, in repairing its pipelines, ensure that the repairs are made in a safe manner and are made so as to prevent ...
2351 Steps involved with pipeline abandonment "1103. ABANDONMENT: Each pipeline abandoned in place shall be disconnected from all sources and supplies of natural gas and petroleum, purged of ...
2330 When pipelines cross crop lands, the operator must segregate topsoil and trenches must be backfilled. "d. Excavation, backfill and reclamation. (1) When pipelines cross crop lands, unless waived by the surface owner, the operator shall segregate ...
2339 With a written agreement from the surface owner, a pipeline may be built where the minimum cover can not be attained. "c. Cover. (2) Where an underground structure, geologic, economic or other uncontrollable condition prevent pipelines from being installed with ...