You are viewing BMP records related to the Colorado Oil and Gas Conservation Commission, Practice and Procedure, 2 CCR 404-1, Final Draft Rules 11 07 08, 1000 SERIES RECLAMATION REGULATIONS publication.

BMP ID Short Title Text of BMP
2301 A minimum of 3 feet of backfill cover over a drilling pit "d. Drilling pit closure. As part of interim reclamation, drilling pits shall be closed in the following manner: (3)Minimum cover. On crop lands, a ...
2267 Access roads should be practical and avoid erosion. All vehicles will not travel outside of the original access road boundary "e. Surface disturbance minimization. (4) Access roads. Existing roads shall be used to the greatest extent practicable to avoid erosion and minimize ...
2279 Address the transportation of chemicals and materials, including loading and unloading "f. Stormwater management. (3)A....Pollutant sources that must be addressed by BMPs, if present, include: i. Transport of chemicals and materials, ...
2373 After the drilling pit is sufficiently dry, the pit shall be backfilled. "d. Drilling pit closure....(2) Drilling pit closure on non-crop land. All drilling fluids shall be disposed of in accordance with the 900 Series ...
2299 All areas compacted by drilling operations shall be cross-ripped. "c.Compaction alleviation. All areas compacted by drilling and subsequent oil and gas operations which are no longer needed following completion of ...
2306 All disturbed areas must be kept free of undesirable plant species "f. Weed control. During drilling, production, and reclamation operations, all disturbed areas shall be kept as free of all undesirable plant ...
2268 All oil and gas locations are subject to the BMP Practices requirements of Rule 1002.f.(2) "f. Stormwater management. (1) All oil and gas locations are subject to the Best Management Practices requirements of Rule 1002.f.(2). In addition, ...
2303 All segregated soil horizons must be replaced to original positions "e. Restoration and revegetation....(1)Revegetation of crop lands. All segregated soil horizons removed from crop lands shall be replaced to their ...
2290 BMP includes pollutant sources, regarding erosion and vehicle tracking "f. Stormwater management. (3)A....Pollutant sources that must be addressed by BMPs, if present, include: vii. Erosion and vehicle tracking from well ...
2294 BMP includes pollutant sources, regarding ground disturbing maintenance activities "f. Stormwater management. (3)A....Pollutant sources that must be addressed by BMPs, if present, include: x. Ground-disturbing maintenance ...
2293 BMP includes pollutant sources, regarding leaks and spills "f. Stormwater Management. (3)A....Pollutant sources that must be addressed by BMPs, if present, include: ix.Leaks and spills."
2286 BMP includes pollutant sources, regarding outdoor processing activities and machinery "f. Stormwater management.(3)A....Pollutant sources that must be addressed by BMPs, if present, include: v. Outdoor processing activities and ...
2282 BMP includes pollutant sources, regarding outdoor storage activities "f. Stormwater management. (3)A.... Pollutant sources that must be addressed by BMPs, if present, include: iii. Outdoor storage activities, including ...
2288 BMP includes pollutant sources, regarding significant dust "f. Stormwater management.(3)A.... Pollutant sources that must be addressed by BMPs, if present, include: vi. Significant dust or particulate ...
2291 BMP includes pollutant sources, regarding waste disposal practices "f. Stormwater management. (3)A....Pollutant sources that must be addressed by BMPs, if present, include: viii. Waste disposal practices."
2284 BMP includes pollutant sources, regarding water and drilling fluids storage "f. Stormwater management. (3)A.... Pollutant sources that must be addressed by BMPs, if present, include: iv. Produced water and drilling fluids ...
2269 BMP Operators will control stormwater runoff at all oil and gas locations. "f. Stormwater management. (2) Oil and gas operators shall implement and maintain Best Management Practices (BMPs) at all oil and gas locations to ...
2296 BMPs include additional facility-specific maps and implementation criteria "f.(3)C. Facility-specific maps, installation specification, and implementation criteria shall also be included when general operating procedures and ...
2300 Close drilling pits for reclamation "d. Drilling pit closure. As part of interim reclamation, drilling pits shall be closed in the following manner: (1) Drilling pit closure on crop ...
2254 Director conducts onsite inspection if adverse environmental impacts occur "b. Additional requirements. Notwithstanding the provisions of the 1000 Series rules, when the Director has reasonable cause to believe that a ...
Page:<< Previous|123|Next >>   Goto to page: