3753 |
Above ground facilities will not be located near active raptor nests |
"Well pads, access roads, and other aboveground facilities will not be located within 825 feet of an active raptor nest, within 1,000 feet of an ... |
1042 |
Aboveground facilities will not be located near raptor nests |
"Well pads, access roads, and other aboveground facilities will not be located within 825 feet of an active raptor nest, within 1,000 feet of an ... |
3747 |
All JIDPA operators shall provide the Authorized Officer the lease number and legal desription for all acres they operate. |
"Within six (6) months of the approval of the ROD, all JIDPA Operators shall provide the Authorized Officer the lease number and legal description ... |
3798 |
All new development facilities will be placed at centralized locations |
"All new development and production facilities in the JIDPA will be placed at centralized locations to accommodate multiple wells... " |
3765 |
All operators will comply with WDEQ established BAT standards |
"Operators will demonstrate by January 31 each year that emission reductions from the Jonah Infill Drilling Project will reduce the potential impact ... |
3802 |
Analyze condensate collection |
"Analyses [of condensate collection] must be provided within one (1) year of the ROD [record of decision]." |
3767 |
BLM may run an air dispersion model |
"Operators will demonstrate by January 31 each year that emission reductions from the Jonah Infill Drilling Project will reduce the potential impact ... |
3771 |
BLM will consult with WDEQ-AQD, EPA, USFS, and NPS |
"If in the future air monitoring were to show ozone exceedances attributable at least in part to sources in the Jonah field, BLM will consult with ... |
3772 |
BLM will continue to work cooperatively with WDEQ, EPA, USFS, and NPS |
"BLM will continue to work cooperatively with WDEQ, EPA, USFS, and NPS to maintain and enhance concentration, atmospheric deposition, and visibility ... |
3768 |
BLM will rely on operators |
"Operators will demonstrate by January 31 each year that emission reductions from the Jonah Infill Drilling Project will reduce the potential impact ... |
3770 |
BLM will review ozone data collected in the area |
"In cooperation with the JIO established under the ROD, BLM will review ozone data collected in the area." |
3761 |
BLM will track numbers of wells, drill rigs, drilling emissions and compressor stations. |
"The BLM will work cooperatively with state and other federal agencies, and with industry, to track emissions in the Pinedale Field Office area. a. ... |
3769 |
BLM's performance objective will be attained |
"Operators will demonstrate by January 31 each year that emission reductions...will reduce the potential impact to visibility as follows: f. BLM's ... |
3799 |
Centralize existing development facilities |
"The Operators will centralize existing development and production facilities to the extent economically feasible." |
3800 |
Centralized fracturing process will be required |
"Centralized fracturing processes will be required for all well pads when surface density is _ 1 well pad/40 acres, and recommended when well pad ... |
3817 |
Certified design not required for cross-drain structures installed outside existing natural drainage courses |
"Cross-drain structures installed outside existing, natural drainage courses will not require certified civil engineer design." |
2236 |
Compressor stations near leks. |
"Compressor stations will be sited at least 2.0 miles away from greater sage-grouse leks and no closer than 0.5 mile to an active raptor nest." |
3752 |
Coordinate with the Authorized Officer and JIO to review and revise JWMPP |
"Operators will coordinate with the Authorized Officer and JIO to review and revise the Jonah Wildlife Monitoring and Protection Plan within 1 year ... |
3790 |
Credit will be applied to the surface disturbance ceiling for operated acreages on an acre-for-acre basis |
"Credit will be applied to the surface disturbance ceiling for operated acreages on an acre-for-acre basis for areas the BLM considers to have met ... |
1068 |
Develop wildlife habitat evaluations within 1 year of ROD |
"Wildlife habitat evaluations using Habitat Evaluation Procedures (HEP) and Habitat Suitability Indices (HSI) for appropriate species will be ... |